Incident 2023/SAR/029 · NAOC · 9 Feb 2023
THE CAUSE WAS AS A RESULT OF SABOTAGE SINCE THERE WAS A VISIBLE INSTALLATION OF 3'' VALVE AT 12 O'CLOCK POSITION. THE IMPACTED AREA WAS WITHIN COMPANY RIGHT OF WAY. VEGETATION WERE IMPACTED.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.