Incident NOSDRA/067/2022 · CHEVRON · 30 Nov 2022
An illegal 4'' valve with pipe connection was installed on the company's pipeline at 12 O' clock position.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.