Incident 2022/SAR/053/119 · NAOC · 15 Jun 2022
THE SPILL WAS AS A RESULT OF SABOTAGE SINCE THERE WAS A VISIBLE INSTALLED 4'' VALVE ON THE PIPELINE AT 12 O'CLOCK POSITION. THE SPILL WAS WITHIN COMPANY RIGHT OF WAY.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.