Incident 2022/SAR/043/107 · NAOC · 9 Jun 2022
THE SPILL WAS AS A RESULT OF SABOTAGE SINCE THERE WAS A VISIBLE INSTALLED 3'' VALVE ON THE PIPELINE AT 12 O'CLOCK POSITION. THE SPILL WAS WITHIN COMPANY RIGHT OF WAY.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.