Incident 2022/SAR/054/121 · NAOC · 16 Jun 2022
THE SPILL WAS DUE TO SABOTAGE SINCE THERE WAS A VISIBLE INSTALLED 2'' VALVE ON THE PIPELINE AT 12 O'CLOCK POSITION. THE SPILL WAS WITHIN COMPANY RIGHT OF WAY.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.