Incident 2022/SAR/044 · NAOC · 9 Jun 2022
THE SPILL WAS DUE TO SABOTAGE SINCE THERE WAS VISIBLE INSTALLED 4'' VALVE ON THE PIPELINE AT 12 O'CLOCK POSITION. THE SPILL OUTSIDE COMPANY RIGHT OF WAY. VEGETATION WAS IMPACTED.
Environmental Barge Leakage at Nembe 1 Manifold.