Incident 2021/SAR/NL/007 · NAOC · 19 Jul 2021
THE SPILL WAS DUE TO SABOTAGE SINCE THERE WAS A VISIBLE INSTALLED 2'' VALVE ON THE PIPELINE AT 12 O'CLOCK POSITION.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI