Incident 2022/SAR/030 · NAOC · 17 May 2022
THE SPILL WAS DUE TO SABOTAGE SINCE THERE WAS A VISIBLE INSTALLED 3'' VALVE ON THE PIPELINE AT 12 O'CLOCK POSITION. THE SPILL WAS WITHIN COMPANY RIGHT OF WAY. VEGETATION WAS IMPACTED.
Environmental Barge Leakage at Nembe 1 Manifold.