Incident 2022/SAR/086 · NAOC · 26 Aug 2022
THE SPILL WAS DUE TO SABOTAGE SINCE THERE WAS A VISIBLE INSTALLED 2'' VALVE ON THE PIPELINE AT 12 O' CLOCK. THE SPILL WAS WITHIN COMPANY RIGHT OF WAY.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.