Incident 2022/SAR/083 · NAOC · 20 Aug 2022
THE SPILL WAS DUE TO SABOTAGE SINCE THERE WAS A VISIBLE INSTALLED 4'' VALVE ON THE PIPELINE AT 12 O' CLOCK POSITION. THE SPILL WAS WITHIN COMPANY RIGHT OF WAY. SURFACE WATER IMPACTED.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.