Incident 2022/SAR/006/022 · NAOC · 10 Feb 2022
THE SPILL WAS DUE TO SABOTAGE SINCE THERE WAS A VISIBLE OF ABOUT 200MM LONG CUT CAUSED BY EXPLOSIVE AND CUTTING DEVICE. THE SPILL WAS OUTSIDE COMPANY RIGHT OF WAY. VEGETATION AND SURFACE WATER WERE IMPACTED
Environmental Barge Leakage at Nembe 1 Manifold.