Incident 2022/SAR/037 · NAOC · 1 Jun 2022
THE SPILL WAS DUE TO SABOTAGE SINCE THERE WAS A VISIBLE 4'' FLANGE VALVE INSTALLATION ON THE PIPELINE AT 12 O' CLOCK POSITION. THE SPILL WAS WITHIN COMPANY RIGHT OF WAY.
Environmental Barge Leakage at Nembe 1 Manifold.