Incident 2022/SAR/037 · NAOC · 1 Jun 2022
THE SPILL WAS DUE TO SABOTAGE SINCE THERE WAS A VISIBLE 4'' FLANGE VALVE INSTALLATION ON THE PIPELINE AT 12 O' CLOCK POSITION. THE SPILL WAS WITHIN COMPANY RIGHT OF WAY.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.