Incident 2022/SAR/017/050 · NAOC · 25 Mar 2022
THE SPILL WAS AS A RESULT OF SABOTAGE SINCE THERE WAS A VISIBLE 3'' FLANGE VALVE INSTALLATION ON THE PIPELINE AT 12 O' CLOCK POSITION. THE SPILL WAS OUTSIDE COMPANY RIGHT OF WAY. VEGETATION WERE IMPACTED.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.