Incident 2022/SAR/017/050 · NAOC · 25 Mar 2022
THE SPILL WAS AS A RESULT OF SABOTAGE SINCE THERE WAS A VISIBLE 3'' FLANGE VALVE INSTALLATION ON THE PIPELINE AT 12 O' CLOCK POSITION. THE SPILL WAS OUTSIDE COMPANY RIGHT OF WAY. VEGETATION WERE IMPACTED.
Environmental Barge Leakage at Nembe 1 Manifold.