Incident 2022/SAR/082 · NAOC · 18 Aug 2022
THE SPILL WAS AS A RESULT OF SABOTAGE SINCE THERE WAS A VISIBLE INSTALLATION OF 2'' VALVE ON THE PIPELINE. THE AREA OF IMPACT WAS WITHIN COMPANY RIGHT OF WAY. VEGETATION WERE IMPACTED.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.