Incident 2014/LAR/189/692 · NAOC · 13 Sept 2014
the incident was due to sabotage , 130mm hacksaw cut was seen on the flow line. the impact was on the ROW and the seasonal swamp.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI