Incident 2014/SAR/472/644 · NAOC · 24 Aug 2014
UNKNOWN PERSON INSTALLED 3" VALVE AT 12 O'CLOCK POSITION ON THE PIPE LINE FOR CRUDE OIL THEFT ACTIVITIES
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Environmental Barge Leakage at Nembe 1 Manifold.
ANGO FLOW STATION AT KOLUAMA
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
11 WELLHEAD MANIFOLD AT OKPAI COMMUNITY