Incident 2013/sar/288/554 · NAOC · 9 Oct 2013
Upon exposure of the flowline, the JIT observed a pin-hole leak at 5 O' Clock position, caused by corrosion.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI