Incident 2019/SAR/090 · NAOC · 13 Dec 2019
THE SPILL WAS DUE TO SABOTAGE SINCE THERE WAS A VISIBLE BLAST ON THE PIPELINE. THE AREA OF IMPACT WAS WITHIN COMPANY FACILITY RIGHT OF WAY. SURFACE WATER WAS IMPACTED.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.