Incident 2021/SAR/079 · NAOC · 17 Dec 2021
THE SPILL WAS DUE TO SABOTAGE SINCE THERE WAS A VISIBLE INSTALLATION OF 2'' VALVE ON THE PIPELINE. AREA OF IMPACT WAS OUTSIDE RIGHT OF WAY AND VEGETATION IMPACTED
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.