Incident 2021/SAR/045 · NAOC · 23 Jul 2021
THE SPILL WAS DUE TO SABOTAGE SINCE THERE WAS A VISIBLE DRILLED HOLE ON THE PIPELINE. VEGETATION WAS IMPACTED
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI