Incident 2020/SAR/069 · NAOC · 16 Oct 2020
THE SPILL WAS DUE TO SABOTAGE SINCE THERE WAS A VISIBLE CUT ON THE FACILITY. VEGETATION WAS IMPACTED.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI