Incident 2019/SAR/083 · NAOC · 7 Nov 2019
THE SPILLED WAS DUE TO SABOTAGE SINCE THERE WAS A VISIBLE INSTALLATION OF 2'' VALVE ON THE PIPELINE.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI