Incident 2020/SAR/013/029 · NAOC · 13 Feb 2020
THE SPILLED WAS DUE TO SABOTAGE SINCE THERE WAS A VISIBLE SIGNED OF BLAST ON THE PIPELINE. FARMLAND, FISH POND, VEGETATION AND SURFACE WATER WERE IMPACTED
Environmental Barge Leakage at Nembe 1 Manifold.