Incident NPDC/HSE/OLO/03/21 · NPDC · 18 Dec 2021
2'' Valve was observed installed on the 10'' Export Pipeline at Valve House, 12' O clock Position. The incident was within the company's right of way.
10'' EXPORT LINE OREDO - OLOGBO - OGHAREFE
OML 152 6'' FLOWLINE AROUND UMUGHUN NOKHUA ROW
10'' GAS EXPORT PIPELINE AT OBAZAGBON
AROH FLOW LINE RIGHT OF WAY AT AJAMIMOGHAN
OROGHO 11, OML 98 OPERATIONS AT OROGHO.