Incident NPDC/NEC/HSE/SPL/2021/002 · Neconde · 2 Sept 2021
Surface water was impacted, the spill was within and outside the company's right of way. 4'' illegal hot tap valve was observed to be attached to the company's 16'' pipeline at 12 O' clock position.