Incident 3025072 · SPDC · 7 Sept 2021
Unknown persons dug the ROW and install a 3" ball valve at 12 o'clock position on the pipeline. Impact was on and ouside ROW. 4 bbl of crude was recovered during JIV.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
6'' AGGU A LOCATION
12" Oguta - Egbema P/L Umunku, Oguta LGA, Imo State.
OSSU OBODO WELL-14/21 AT OSSU OBODO
16" EGBEMA - ASSA TL ROW @ ETEKWURU, OHAJI/EGBEMA LGA, IMO STATE