Incident 2771184 · SPDC · 29 Oct 2020
A 2 nos locally fabricated clamps Points A and B with a 1” ball valve each, was seen at 12 o’clock position on the pipeline. Point A was non leaking which had elbow pipe attached to the ball valve. Point B was the leaking point.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State