Incident 2779835 · SPDC · 9 Nov 2020
Vegetation, surface water and soil were impacted, the spill was within and outside the company's right of way. 4'' valve attached to the 20'' pipeline at 12 O' Clock position.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
W14T WELL HEAD OKPARE-OLOMU
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
9B - 83 WELL FLOWLINE @ OLERO RMP 17
OLERO BENIN RIVER BR-13D FLOW LINE @ RMP-1
4'' ESCRAVOS WELL 3T FLOWLINE AT OGIDIGBEN