Incident 2020/SAR/015 · NAOC · 26 Feb 2020
THE SPILLED WAS DUE TO SABOTAGE SINCE A VISIBLE INSTALLATION OF 2'' VALVE WAS SEEN ON THE PIPELINE AT 12 O'CLOCK POSITION AFTER EXCAVATION. THERE WAS VISIBLE OIL STAINED VEGETATION WITHIN THE IMPACTED AREA.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.