Incident 2019/LAR/107 · NAOC · 29 Sept 2019
THE SPILLED WAS DUE TO SABOTAGE SINCE THERE WAS VISIBLE INSTALLATION OF 3'' NIPPLE AND 3'' BALL VALVE AT 12 O'CLOCK POSITION FOR SPILLED POINT 1 & 2 RESPECTIVELY ON THE FACILITY AFTER EXCAVATION. MATERIAL SPILLED FOR POINT 1 & 2 WERE CONDENSATE AND GAS EMISSION. VEGETATION WAS IMPACTED.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.