Incident 2019/LAR/103 · NAOC · 17 Sept 2018
THE SPILLED WAS DUE TO SABOTAGE SINCE THERE WAS A VISIBLE HACKSAW CUT ON THE FACILITY. VEGETATION WAS IMPACTED.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI