Incident 2020_ 2709278 · SPDC · 15 Aug 2020
Locally (Iron) Fabricated Clamp Installed on the pipe line at 12 0' clock position by unknown person(s) for the theft activities.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
IMO-RIVERS WELL 65T FLOWLINE AT OWAZA, UKWA WEST L.G.A ABIA STATE
12'' IMO-RIVER DELIVERY LINE A AT OWAZA, UKWA-WEST L.G.A.
24'' Ogale - Bonny TNP @ Kpite/Biara comm.
4'' ETELEBU WELL 15s FLOWLINE AT AKENFA, OGBOLOMA AND AYAKIRI