Incident 2020_2635959 · SPDC · 30 Apr 2020
• 1.5’’ ball valve with a locally fabricated clamp was installed on the pipeline at 12 O’clock position by unknown persons. This is attributed to third party interference (oil theft activity). • The spill point was established as a leaking point. • Prior to mechanical exposure of the spill point, there was evidence of free phase on the Right of Way and the third party area. • SPDC’s ROW and adjoining vegetation are impacted areas during JIV.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
IMO-RIVERS WELL 65T FLOWLINE AT OWAZA, UKWA WEST L.G.A ABIA STATE
12'' IMO-RIVER DELIVERY LINE A AT OWAZA, UKWA-WEST L.G.A.
24'' Ogale - Bonny TNP @ Kpite/Biara comm.
4'' ETELEBU WELL 15s FLOWLINE AT AKENFA, OGBOLOMA AND AYAKIRI