Incident 2019/SAR/069/165 · NAOC · 14 Sept 2019
AFTER EXCAVATION, THERE WAS A VISIBLE INSTALLATION OF 2'' VALVE ON THE PIPELINE. THE AREA OF IMPACT WAS WITHIN COMPANY ROW.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI