Incident 2020/SAR/001 · NAOC · 11 Jan 2020
THERE WAS AN EVIDENCE OF HACKSAW CUT ON THE PIPELINE. THE SPILLED CRUDE WAS MOPPED IMMEDIATELY.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI