Incident 2019-2529690 · SPDC · 15 Dec 2019
A 1.5 inch Pipe was installed at 12 O'clock position on 12 inch Imo-River 1-Ogale Pipeline at Umuololo, Ukwa West in Abia State by unknown person(s) for theft.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
IMO-RIVERS WELL 65T FLOWLINE AT OWAZA, UKWA WEST L.G.A ABIA STATE
12'' IMO-RIVER DELIVERY LINE A AT OWAZA, UKWA-WEST L.G.A.
24'' Ogale - Bonny TNP @ Kpite/Biara comm.
4'' ETELEBU WELL 15s FLOWLINE AT AKENFA, OGBOLOMA AND AYAKIRI