Incident 2019/SAR/GL/001 · NAOC · 1 Jan 2019
THERE WAS AN EVIDENCE OF CUT AND BLAST ON THE FLOWLINE. VEGETATION WITHIN AND OUTSIDE RIGHT OF WAY WERE IMPACTED.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI