Incident 2019/SAR/GL/003 · NAOC · 7 Feb 2019
THERE WAS A VISIBLE SIGN OF HACKSAW CUT ON THE PIPELINE. ESTIMATED QUANTITY WAS NOT RECORDED SINCE IT IS A GASEOUS EMISSION.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI