Incident 2019/SAR/013/034 · NAOC · 31 Jan 2019
THERE WAS A VISIBLE CUT ON THE PIPELINE. THE OPEN RIVER WAS IMPACTED.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI