Incident 2019/SAR/NL/005 · NAOC · 1 Apr 2019
THERE WAS AN EVIDENCE OF HACK SAW CUT ON A PREVIOUSLY REPAIRED POINT. IT IS A NON-LEAK POINT.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI