Incident 2019/SAR/039/091 · NAOC · 28 Apr 2019
THERE WAS AN EVIDENCE OF PREVIOUSLY REPAIRED CUT OFF CONE AND INSTALLATION OF 3'' VALVE ON THE PIPELINE.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI