Incident 2018/LAR/101/128 · NAOC · 27 Jul 2018
THERE WAS AN EVIDENCE OF HACKSAW CUT ON THE FLOWLINE. VEGETATION WITHIN RIGHT OF WAY WAS IMPACTED
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI