Incident 2018/LAR/097/123 · NAOC · 27 Jul 2018
THERE WAS A VISIBLE HACKSAW CUT ON THE FLOWLINE. VEGETATION WITHIN RIGHT WAY WAS IMPACTED
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI