Incident 2019/LAR/107/181 · NAOC · 29 Sept 2019
THERE WAS A VISIBLE INSTALLATION OF 3'' NIPPLE AND 3'' BALL VALVE WITH CONNECTION ON THE FACILITY. VEGETATION WAS IMPACTED.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI