Incident 2018/SAR/057/205 · NAOC · 17 Nov 2018
THERE WAS AN EVIDENCE OF CUT OFF CONE OF A PREVIOUSLY REPAIRED POINT.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI