Incident 2019/LAR/049 · NAOC · 7 Jan 2019
THERE WAS AN EVIDENCE OF TEAR AND DEPRESSION ON THE PIPELINE. VEGETATION WITHIN AND OUTSIDE RIGHT OF WAY WERE IMPACTED
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI