Incident 2019/SAR/072/174 · NAOC · 23 Sept 2019
THERE WAS AN EVIDENCE OF HACKSAW CUT ON THE PIPELINE. VEGETATION AND SURFACE WATER WERE IMPACTED.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI