Incident 2019_2368600 · SPDC · 6 Jun 2019
Locally Fabricated Clamp with 1'' valve connected to 1'' pipe with concrete casting cement at the center installed on the trunk line @ 12'O clock position by unknown.
Continue through records connected by state or company. Similar records do not necessarily describe the same event.
10” Diebu Creek-Nun River Delivery Line Right of Way at Eniwari Yenagoa, Bayelsa State
IMO-RIVERS WELL 65T FLOWLINE AT OWAZA, UKWA WEST L.G.A ABIA STATE
12'' IMO-RIVER DELIVERY LINE A AT OWAZA, UKWA-WEST L.G.A.
24'' Ogale - Bonny TNP @ Kpite/Biara comm.
4'' ETELEBU WELL 15s FLOWLINE AT AKENFA, OGBOLOMA AND AYAKIRI