Incident 2019/SAR/NL/001 · NAOC · 3 Jan 2019
THERE WAS A VISIBLE CUT ON THE PIPELINE. ESTIMATED SPILLED QUANTITY WAS NOT RECORDED SINCE IT IS A NON LEAK POINT.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI