Incident 2018/SAR/NL/007 · NAOC · 30 Oct 2018
THERE WAS A VISIBLE 3'' VALVE INSTALLATION ON THE PIPELINE. ESTIMATED SPILLED QUANTITY WAS NOR RECORDED SINCE IT IS A NON LEAK POINT.
Central Processing facility (CPF) at Nembe Crude Oil Export Terminal.
18" Obama/Brass Pipeline at Okoroma
Address18” Tebidaba-Brass Pipeline at Babaragbene, Southern-Ijaw, Bayelsa State.
6" TUNU WELL 17T FLOWLINE At BILABIRI